The component is then shown visually on the display with the exact pin assignment and the measured values. The current battery voltage is then first briefly displayed and then the component used or connected via cable is tested. To take a measurement, press the power button once. Voltage of primary cells and rechargable batteries (0,1 – 4,5 V).Diodes and zener diodes (0,01 – 4,5 V, break down voltage up to 30V).The display has a diagonal of 1.8″ with a resolution of 160×128 pixels. I replaced the plug with a triple combination and connected the individual wires with shrink tubing to make handling easier. 1 and 3 for a resistor or 1, 2 and 3 for a transistor.Ĭables with clamps are also included in the scope of delivery if the components to be tested cannot be plugged directly into the socket. All other components can be connected to the inputs as you like, but you just have to make sure that you use different contacts, e.g. In addition, there are connections “K” and “A” for measuring Zener diodes. ![]() ![]() We need to change the firmware for our aggregation switch and replace all. Download bonobo the north borders zip line. The components to be tested are inserted into the ZIF socket, each of which offers three connections in multiple repetition. Name: 2 PAC - ALL EYEs ON ME.mp3 Size: 4.71.
0 Comments
Leave a Reply. |